The enormity of what was supposedly a "simple renovation" is dawning on me. How do people build complicated buildings like sky scrapers and shopping centres? 59 Hunter Street is really only a fit-out of two (albeit large) rooms: one downstairs and one upstairs. I will attach a scribbled plan to help you sort out the things I keep talking about. I know Rowan is getting nervous that there will be no room for him when he comes back to Oz. There will be heaps of room - it just isn't divided into rooms! Btw...the leaking AMP wall is the one on the right hand side of the drawings.





 
Today, the "air-conditioning man" installed a unit downstairs. This is our insurance policy. We are assuming that we won't have to use this machine (often) because he have thoroughly planned maximising air-flow and utilising thermal mass. Just in case...it gets really hot or really cold. There are several jobs that have be done this week before the scafflod comes down on Saturday and this installation was one of them. He may have put one upstairs too but we remained ladder-challenged. The guy somehow overlooked to tell anyone that he had finished work and just walked out, leaving the place wide open. Luckily, Lester worked late and locked up. 


Air-conditioning unit in kitchen


Front door - 7.00pm



No comments:

Post a Comment